Capital-backed operators and infrastructure investors only | No spam, no obligation
From CRE to Data Infrastructure — Decoded, Scored, and Mapped
Most teams speak CRE or data centers. B2B Systems translates both —
with a vetted pipeline across all 50 states.
What We Decode
Industrial Warehouses → Hyperscale-Ready Shells
Office Buildings → Edge Compute Sites
Location Value → Infrastructure ROI Potential
Explore the Map — A Strategic Preview of Off-Market Infrastructure Sites
This dynamic map offers a curated glimpse into our national pipeline of AI-aligned, power-feasible data center sites. To maintain exclusivity, coordinates are approximate—site-level details are reserved for qualified partners.
This is not a listing—it’s a signal. Each marker reflects a vetted opportunity already in motion. The true value lies in what’s not visible—and in the conversations it initiates.
Loading...
How We Vet Sites
Each site is reviewed across 12 infrastructure siting factors:
Power capacity + grid stability
Fiber and cooling proximity
Latency + cost profile
Expansion + workforce potential
Incentive eligibility + risk profile
Regulatory + acquisition readiness
Vetting sources: CBRE/JLL databases, utility schedules, proprietary infra scoring. Top 200 sites re-scored quarterly.
50
States Mapped & Scored
1,676
Sites Reviewed Across 12 Criteria
2
Verticals CRE + Infra in One Platform
$30B+ Hyperscaler Demand Is Redrawing the Map — Are Your Sites Positioned?
Our 1,676-site platfoSrm captures adjacency upside with pre-vetted sites positioned near megaprojects — ready now.
Microsoft: $7B Wisconsin Investment | 50+ Sites
Massive hyperscale deployment drives unprecedented demand for secondary sites, DR locations, and edge infrastructure across the Midwest corridor.
Stargate Project: $15B AI Infrastructure | 150+ Sites
OpenAI-backed megaproject transforms power-dense computing requirements and drives site adjacency premiums.
Meta/Google: $8B+ Midwest Expansion
Multiple hyperscalers target Midwest for lower costs, renewable energy, and fiber access.
Result: Surging demand for secondary markets, edge deployments, and power-ready CRE.
Market Implications:
300+ new sites needed by 2027
15–50MW demand per site
Midwest + Mountain West hot zones
Q1–Q2 2025 = Prime siting window closes
Sources: Microsoft SEC 10-K (Feb 2024) | OpenAI/Stargate press release (Mar 2024) | JLL DC Report Q4 2024
1,676 Vetted Sites. 50 States. Filter in Seconds.
Evaluate power, readiness, fiber, and market adjacency — instantly.
Dual-Lens Site Analysis
Every site scored for both CRE fundamentals and digital infrastructure fit.
Real Infrastructure Metrics
Power (3-phase), scalable MW, fiber, cooling, and regulatory readiness.
Market Intelligence
Tier 1/2/3, Emerging zones, Stargate adjacency, Opportunity Zone status.
Visual Framework: How We Filter the U.S. Site Landscape
This illustration reflects our methodology for vetting sites across all 50 states — factoring in power capacity, deployment readiness, infrastructure adjacency (e.g., Stargate), and market tier overlays.
Note: This is a static visual, not an interactive tool like the dynamic map above. It’s designed to showcase the filters our platform uses to unlock off-market data center opportunities.
Case Study: Regional colocation operator deployed 3MW across 2 facilities via Risk Share model—achieved 22% IRR with 18-month path to profitability and zero upfront CapEx
Want the Sites, Audit & IRR Playbook — within 24 hours?
Get immediate access to the same infrastructure data powering $30B+ deployments. No fluff. No sales pitch. Just what matters:
What You'll Get:
1,676 MW-feasible sites — pre-screened across 50 states
Used by 12 operators to deploy 586kW since Q3 2024. IRR model independently audited. Platform backed by $30B+ infrastructure pipeline.
B2B Systems Site Access Brief
1,676 Sites | 22.1% IRR Audited | Zero CapEx Deployment Model
Proof Points
1,676 Sites
Vetted across all 50 states
22.1% IRR
Audited FY2024
586kW Live Operators
Deployed since Q3 2024
$30B+ Pipeline
Microsoft, Meta, Stargate
Tier III Certified | Sub-2ms Latency | FFIEC Compliant
How It Works
Get access to pre-vetted data center sites with power, fiber, and infrastructure scoring. Filter by readiness, market tier, and adjacency. Choose your path: Turnkey, Risk Share, or Light Touch. Deploy with zero CapEx or co-invest structure.
Partnership Models
Flagship Site Performance
IRR & Equity Multiple
IRR: 22.1% | Equity Multiple: 4.78×
Uptime & Certification
Uptime: 98.5% | Tier III Certified
Latency
Latency: Sub-2ms to Chicago CME
Power Arbitrage
Power Arbitrage: 4.5¢ vs 8.7¢/kWh
Status
Status: 75,000 SF live since Q3 2024
Full audit available upon NDA
Your Fast Track
1
15-min Qualification Call
2
Platform Access + Custom Site List
3
LOI on Target Sites
Founding Partner Window Ends Dec 31, 2025
After this: +15% pricing and 6-month waitlist for prime sites
Contact
Ross Beal
Founder & CRE Lead Strategist
(408) 479-0828
access@b2bsystems.com
Jeff Lee
Technical Consultant - Digital Infrastructure
(209) 423-4860
lee.j@cyberlandsecurity.com
Used by 12 Operators | $30B+ Pipeline | 22.1% IRR Audited FY2024
Ready to unlock your custom site list?
1
Book Your 15-Min Qualification Call
2
Platform Access Within 24 Hours
3
1,676 Sites. Zero CapEx. Instant Access.
Share This Brief with a Decision-Maker
This site access model is being used to unlock cash-flowing infrastructure with zero CapEx required. Send to your investment committee, ops team, or site strategy lead.