Audited FY2024
586kW deployed since Q3 2024
Microsoft, Stargate, Meta
Sub-2ms latency | FFIEC compliant
Founders and capital-backed operators prioritized. Platform access within 24 hours.
Visual overview of IRR audit, live operator deployments, expansion sites, and 50-state site map.
→ Click any page to enlarge — or Download Full Brief (PDF)




Watch how capital-backed operators go live in 2 weeks—without outside funding. Includes IRR mechanics and proof points.
No login required. 2-minute form. Platform access within 24 hours.
Upon submission: Link to schedule 15-min call + download audit PDF
Capital-backed operators and infrastructure investors only | No spam, no obligation
Explore the Map — A Strategic Preview of Off-Market Infrastructure Sites
This dynamic map offers a curated glimpse into our national pipeline of AI-aligned, power-feasible data center sites.
To maintain exclusivity, coordinates are approximate—site-level details are reserved for qualified partners.
This is not a listing—it’s a signal.
Each marker reflects a vetted opportunity already in motion.
The true value lies in what’s not visible—and in the conversations it initiates.
Each site is reviewed across 12 infrastructure siting factors:
Vetting sources: CBRE/JLL databases, utility schedules, proprietary infra scoring. Top 200 sites re-scored quarterly.
States
Mapped & Scored
Sites
Reviewed Across 12 Criteria
Verticals
CRE + Infra in One Platform
Massive hyperscale deployment drives unprecedented demand for secondary sites, DR locations, and edge infrastructure across the Midwest corridor.
OpenAI-backed megaproject transforms power-dense computing requirements and drives site adjacency premiums.
Multiple hyperscalers target Midwest for lower costs, renewable energy, and fiber access.
Result: Surging demand for secondary markets, edge deployments, and power-ready CRE.
Sources: Microsoft SEC 10-K (Feb 2024) | OpenAI/Stargate press release (Mar 2024) | JLL DC Report Q4 2024
Every site scored for both CRE fundamentals and digital infrastructure fit.
Power (3-phase), scalable MW, fiber, cooling, and regulatory readiness.
Tier 1/2/3, Emerging zones, Stargate adjacency, Opportunity Zone status.
This illustration reflects our methodology for vetting sites across all 50 states — factoring in power capacity, deployment readiness, infrastructure adjacency (e.g., Stargate), and market tier overlays.

Note: This is a static visual, not an interactive tool like the dynamic map above. It’s designed to showcase the filters our platform uses to unlock off-market data center opportunities.
Platform access granted within 24 hours | Capital-backed operators prioritized
vs 8.7¢/kWh (48% cost advantage)
Equity Multiple¹
65 miles from Chicago
117% of 50% gate
¹ Audited financial performance, FY2024 | Access to full data room on approval
¹ Racine Edge audited metrics, FY2024 | $30B from Microsoft/Stargate/Meta (see Slide 3 sources)
$190-225/kW
Wholesale Lease
Operator leases entire facility at $190-225/kW. Full control, predictable costs, no development risk.
Key Features:
Best For:
Used by 8 operators since 2023
60/40 Split
Revenue Share 60/40
Split economics on tenant contracts (net revenue after direct OPEX). Operator gets 60%, we keep 40%. Lower fixed costs, shared upside.
Key Features:
Best For:
Enabled 22% IRR for 3MW colo deployment
10% Commission
Referral 10%
Introduce qualified leads, earn 10% commission on closed deals. Zero investment, pure lead monetization.
Key Features:
Best For:
Generates passive monthly deal flow
Want control? → Turnkey | Want flexibility? → Risk Share | Just want upside? → Light Touch
Case Study: Regional colocation operator deployed 3MW across 2 facilities via Risk Share model—achieved 22% IRR with 18-month path to profitability and zero upfront CapEx
Vetted across all 50 states
Audited FY2024
Deployed since Q3 2024
Microsoft, Meta, Stargate
Tier III Certified | Sub-2ms Latency | FFIEC Compliant
Get access to pre-vetted data center sites with power, fiber, and infrastructure scoring. Filter by readiness, market tier, and adjacency. Choose your path: Turnkey, Risk Share, or Light Touch. Deploy with zero CapEx or co-invest structure.
IRR: 22.1% | Equity Multiple: 4.78×
Uptime: 98.5% | Tier III Certified
Latency: Sub-2ms to Chicago CME
Power Arbitrage: 4.5¢ vs 8.7¢/kWh
Status: 75,000 SF live since Q3 2024

Ross Beal
Founder & CRE Lead Strategist
(408) 479-0828
access@b2bsystems.com

Jeff Lee
Technical Consultant - Digital Infrastructure
(209) 423-4860
lee.j@cyberlandsecurity.com
Founding Partner Window Ends Dec 31, 2025
1,676 power-ready, fiber-lit, CRE-vetted sites
FY2024 audited 22.1% IRR deployment model
Operator-owned, zero CapEx structures
586kW deployed since Q3 2024 — already live
This is the platform used by 12 operators to unlock high-performance digital infrastructure — without tenant constraints or capital delays.
1,676 Sites. Vetted Pipeline. Deploy — Without Raising Capital.