1,676 Sites. Vetted Pipeline. Deploy — Without Raising Capital.

Go live now at Racine Edge — a Tier III-certified digital campus with 22.1% IRR, 586kW deployed, and 4–10MW shovel-ready expansion.

Power-ready, fiber-lit data center sites — mapped, vetted, and scored across 50 states. Deployments already live.

22.1%

IRR

Audited FY2024

12

Operators Live

586kW deployed since Q3 2024

$30B+

Wisconsin Pipeline

Microsoft, Stargate, Meta

Tier III

Certified

Sub-2ms latency | FFIEC compliant

Founders and capital-backed operators prioritized. Platform access within 24 hours.

Visual overview of IRR audit, live operator deployments, expansion sites, and 50-state site map.

→ Click any page to enlarge — or Download Full Brief (PDF)

See the Operator Model. Access Sites within 24 Hours.
Fast-Track Deployment — No Fundraising Required.

Watch how capital-backed operators deploy — then access 1,676 scored data center sites.


Loading...

Watch how capital-backed operators go live in 2 weeks—without outside funding. Includes IRR mechanics and proof points.


Get Custom Site Access in 2 Minutes

Loading...

No login required. 2-minute form. Platform access within 24 hours.

Upon submission: Link to schedule 15-min call + download audit PDF


Your Fast Track

01

Submit Form → 2 min

02

Site List + Audit → 24 hours

03

Quick Fit Call → 15 min

04

Site Tour / Data Room → NDA required


12

Operators Live

586kW

Deployed Since Q3 2024

22.1%

IRR Audited

Full Audit Access Available



Capital-backed operators and infrastructure investors only | No spam, no obligation

From CRE to Data Infrastructure — Decoded, Scored, and Mapped

Most teams speak CRE or data centers. B2B Systems translates both —

with a vetted pipeline across all 50 states.

What We Decode

Industrial Warehouses → Hyperscale-Ready Shells

Office Buildings → Edge Compute Sites

Location Value → Infrastructure ROI Potential

Explore the Map — A Strategic Preview of Off-Market Infrastructure Sites

This dynamic map offers a curated glimpse into our national pipeline of AI-aligned, power-feasible data center sites.
To maintain exclusivity, coordinates are approximate—site-level details are reserved for qualified partners.

This is not a listing—it’s a signal.
Each marker reflects a vetted opportunity already in motion.
The true value lies in what’s not visible—and in the conversations it initiates.

Loading...

How We Vet Sites

Each site is reviewed across 12 infrastructure siting factors:

  • Power capacity + grid stability
  • Fiber and cooling proximity
  • Latency + cost profile
  • Expansion + workforce potential
  • Incentive eligibility + risk profile
  • Regulatory + acquisition readiness

Vetting sources: CBRE/JLL databases, utility schedules, proprietary infra scoring. Top 200 sites re-scored quarterly.

50

States
Mapped & Scored

1,676

Sites
Reviewed Across 12 Criteria

2

Verticals
CRE + Infra in One Platform

$30B+ Hyperscaler Demand Is Redrawing the Map — Are Your Sites Positioned?

Our 1,676-site platfoSrm captures adjacency upside with pre-vetted sites positioned near megaprojects — ready now.

Microsoft: $7B Wisconsin Investment | 50+ Sites

Massive hyperscale deployment drives unprecedented demand for secondary sites, DR locations, and edge infrastructure across the Midwest corridor.

Stargate Project: $15B AI Infrastructure | 150+ Sites

OpenAI-backed megaproject transforms power-dense computing requirements and drives site adjacency premiums.

Meta/Google: $8B+ Midwest Expansion

Multiple hyperscalers target Midwest for lower costs, renewable energy, and fiber access.

Result: Surging demand for secondary markets, edge deployments, and power-ready CRE.

Sources: Microsoft SEC 10-K (Feb 2024) | OpenAI/Stargate press release (Mar 2024) | JLL DC Report Q4 2024

1,676 Vetted Sites. 50 States. Filter in Seconds.

Evaluate power, readiness, fiber, and market adjacency — instantly.

Dual-Lens Site Analysis

Every site scored for both CRE fundamentals and digital infrastructure fit.

Real Infrastructure Metrics

Power (3-phase), scalable MW, fiber, cooling, and regulatory readiness.

Market Intelligence

Tier 1/2/3, Emerging zones, Stargate adjacency, Opportunity Zone status.

Visual Framework: How We Filter the U.S. Site Landscape

This illustration reflects our methodology for vetting sites across all 50 states — factoring in power capacity, deployment readiness, infrastructure adjacency (e.g., Stargate), and market tier overlays.

Note: This is a static visual, not an interactive tool like the dynamic map above. It’s designed to showcase the filters our platform uses to unlock off-market data center opportunities.

Platform Filters:

  • Power (100kW–50MW+)
  • Readiness (Immediate / 6mo / 12mo+)
  • Tier (1 / 2 / 3 / Emerging)
  • Stargate Adjacency (<100mi)
  • Opportunity Zone (Yes/No)
  • Size (50K–500K+ SF)
  • State (dropdown)

Platform Capabilities:

  • Real-time site availability
  • Custom comp set builder
  • ROI calculator
  • Export & share reports
  • 24hr platform access
  • Secure data room

Platform access granted within 24 hours | Capital-backed operators prioritized

Racine Edge: Chicago-Tier Performance at 40% Lower Cost

Flagship deployment site with 586kW live and institutional audit completed

4.5¢

Power Advantage

vs 8.7¢/kWh (48% cost advantage)

4.78x

Levered IRR

Equity Multiple¹

1.78ms

Latency to CME

65 miles from Chicago

586kW

Pipeline Committed

117% of 50% gate

Competitive Moat

  • Power arbitrage: 4.5¢ locked rate vs Tier I
  • DR compliant: 65-mile FFIEC-compliant separation
  • Tier III: Certified, redundant, hyperscale-grade infrastructure
  • Pre-capitalized: No operator CapEx required

¹ Audited financial performance, FY2024 | Access to full data room on approval

The 3-Way Value Stack

Everybody wins when CRE and data center converge

Triple alignment: -40% costs | +$650K margins | +22% IRR


OPERATOR BENEFITS

  • $1M+ annual power savings through optimized site selection
  • 12–18 month faster go-to-market vs. greenfield
  • 22.1% IRR achieved with zero CapEx required
  • Live now across 12 deployments — proven model
  • Carrier-neutral fiber + redundant power pre-vetted
  • Instant access to 1,676 ready-to-deploy sites

INVESTOR BENEFITS

  • 22.1% IRR validated by audited FY2024 financials
  • 2.8x equity multiple over 7-year hold period
  • Quarterly distributions starting Month 6
  • Pre-leased capacity reduces vacancy risk
  • $30B+ adjacent infrastructure pipeline (Microsoft/Stargate/Meta)
  • Diversified operator base across 12 live deployments
  • Three partnership models: full control to zero CapEx

ENTERPRISE IT BENEFITS

  • FFIEC-compliant disaster recovery: 200+ mile separation
  • Sub-2ms latency to Chicago CME, sub-5ms to NYC
  • Tier III certified: 99.982% uptime guarantee
  • SOC 2 Type II ready for financial services compliance
  • HIPAA-ready secure colocation with audit trails
  • 24/7 NOC monitoring with SLA guarantees
  • Carrier-neutral connectivity for vendor flexibility

¹ Racine Edge audited metrics, FY2024 | $30B from Microsoft/Stargate/Meta (see Slide 3 sources)

Choose Your Deployment Model — No CapEx Required

Flexible options for operators, growth-stage teams, and capital-light deployment strategies

Full Control, Fixed Cost

$190-225/kW

Wholesale Lease

Operator leases entire facility at $190-225/kW. Full control, predictable costs, no development risk.

Key Features:

  • ✓ Immediate occupancy
  • ✓ 100% revenue to operator
  • ✓ Predictable OPEX
  • ✓ No construction risk

Best For:

  • ✓ Established colo operators
  • ✓ Guaranteed capacity needs
  • ✓ Control-focused partners

Used by 8 operators since 2023

Balanced Partnership, Shared Upside

60/40 Split

Revenue Share 60/40

Split economics on tenant contracts (net revenue after direct OPEX). Operator gets 60%, we keep 40%. Lower fixed costs, shared upside.

Key Features:

  • ✓ Reduced capital requirements
  • ✓ Aligned incentives
  • ✓ Growth-oriented structure
  • ✓ Flexible terms

Best For:

  • ✓ Growth-stage operators
  • ✓ Expansion mode companies
  • ✓ Risk/reward balance seekers

Enabled 22% IRR for 3MW colo deployment

Zero Investment, Pure Monetization

10% Commission

Referral 10%

Introduce qualified leads, earn 10% commission on closed deals. Zero investment, pure lead monetization.

Key Features:

  • ✓ No capital required
  • ✓ Fast onboarding
  • ✓ Commission on close
  • ✓ Recurring revenue share

Best For:

  • ✓ Broker partners
  • ✓ Sales-focused teams
  • ✓ Network monetization

Generates passive monthly deal flow

Want control? → Turnkey | Want flexibility? → Risk Share | Just want upside? → Light Touch

Case Study: Regional colocation operator deployed 3MW across 2 facilities via Risk Share model—achieved 22% IRR with 18-month path to profitability and zero upfront CapEx

Proof Points

1,676 Sites

Vetted across all 50 states

22.1% IRR

Audited FY2024

586kW Live Operators

Deployed since Q3 2024

$30B+ Pipeline

Microsoft, Meta, Stargate

Tier III Certified | Sub-2ms Latency | FFIEC Compliant

How It Works

Get access to pre-vetted data center sites with power, fiber, and infrastructure scoring. Filter by readiness, market tier, and adjacency. Choose your path: Turnkey, Risk Share, or Light Touch. Deploy with zero CapEx or co-invest structure.

Partnership Models

Flagship Site Performance

IRR & Equity Multiple

IRR: 22.1% | Equity Multiple: 4.78×

Uptime & Certification

Uptime: 98.5% | Tier III Certified

Latency

Latency: Sub-2ms to Chicago CME

Power Arbitrage

Power Arbitrage: 4.5¢ vs 8.7¢/kWh

Status

Status: 75,000 SF live since Q3 2024

Your Fast Track

1

15-min Qualification Call

2

Platform Access + Custom Site List

3

LOI on Target Sites

Contact

Ross Beal

Founder & CRE Lead Strategist

(408) 479-0828

access@b2bsystems.com

Jeff Lee

Technical Consultant - Digital Infrastructure

(209) 423-4860

lee.j@cyberlandsecurity.com

1

Book Your 15-Min Qualification Call

2

Platform Access Within 24 Hours

3

1,676 Sites. Zero CapEx. Instant Access.

Not a Tenant. Not a Delay. Own Your Edge.

Ready to Unlock Vetted Sites — Without Raising Capital?

1,676 sites. IRR audited. Operators live. Now it's your move.

Founding Partner Window Ends Dec 31, 2025


1

What You Get:

1,676 power-ready, fiber-lit, CRE-vetted sites

2

FY2024 audited 22.1% IRR deployment model

3

Operator-owned, zero CapEx structures

4

586kW deployed since Q3 2024 — already live

Act Now:

Share With Your Decision-Maker

This is the platform used by 12 operators to unlock high-performance digital infrastructure — without tenant constraints or capital delays.


Not a Tenant. Not a Delay. Own Your Edge.